The power transition at our GRU01 data center has been successfully completed. All infrastructure loads have been safely transferred back to the primary utility power grid from the backup generators, and electrical systems are fully stable.
As verified throughout the entire event, there was zero impact on our services or network connectivity. This incident is now officially closed. Thank you for your patience.
Posted Jun 07, 2026 - 19:48 UTC
Monitoring
Utility power has been successfully restored to the GRU01 data center. On-site engineers are currently transitioning operations back from backup generators to the primary power grid. There has been zero impact on our services, and all systems continue to operate normally. We will maintain this status under monitoring until the power transition is fully completed and verified.
Posted Jun 06, 2026 - 17:57 UTC
Identified
The root cause has been identified as a utility power outage affecting the GRU01 facility region. On-site engineers confirmed that all electrical loads successfully transferred to backup generator power without interruption. Embnex infrastructure and connectivity services remain fully functional and stable. We continue to monitor the site closely.
Posted Jun 06, 2026 - 16:05 UTC
Investigating
We are currently investigating a power disturbance reported at our GRU01 data center facility in São Paulo. Our team is actively monitoring the infrastructure status. At this time, all server loads and routing systems remain stable. Further updates will be provided as details emerge.
Posted Jun 06, 2026 - 15:39 UTC
This incident affected: São Paulo, Brazil - (GRU) (GRU01).